How to commence repair works of the apartment?

The initial stage of the particular repair of old apartments is the destruction and dismantling first of just about all from the dilapidated walls and partition surfaces, removing the walls and ceiling covering. This stage is one of the particular most “dirty” stages from the repair.

1 more being among the most essential and “dusty” works is the windowpane block replacement. You ought to do this very first of all since dirt and dirt will be unallowable during following stages plus it is prohibited at all to open windows in the course of painting and wallpaper works (large drops of the heat and moisture are unallowable). After installation windows and windowsills it is required to pack all of them immediately in polyethylene film and in order to cover windowsills within addition with the fiberboard (in order to avoid scratches).

These period is wiring. Electrical wiring can be installed in walls or even along the ground. Wiring is produced inside the water lines to ensure electric safety and enhance reliability. The pipe protects wiring through external damages plus allows to change the wire totally without breaking walls and floor just by inserting the newest wire instead associated with the old a single.

House Painting employs the wiring. The particular frequent mistake in the course of the simultaneous performing of such performs occurs when employees forget to lay down out one of the cabling and house artists have already drunk and smoothed out your wall. As the result, additional works are necessary in order to seal chases within the finished wall. The places of the feed switch and wall outlet place and the number must be thought-out in advance. The scheme of power wiring is usually integrated into the design project.

Later on the program must be willing to service in case of failures. In addition to typically the wirings, the telephone wire and the TELEVISION cable are presented. The power cable connection must not be laid out near the telephone and antenna cabling to avoid noise pickup and disturbance. Probably the most peculiar second is laying away the TV cable connection. In order in order to make two (or three) TV makes its presence felt the apartment the 2nd cable is usually simply “firmly soldered” in parallel, therefore the cable resistance is lowered. Because a result, typically the display quality is damaged, many programs cannot be received and etc. In buy to avoid such situation it is necessary to ask a specialist with special equipment. He or she will gauge the signal level of typically the each TV-feeder and install TV-amplifiers or even TV-filters.

Painting is among the most long-term process, for this reason it is carried out simultaneously in all premises, if it is feasible. Delays are connected with the technology. Each applied coating of the plastsorter (or filling within finishing) must dried out completely before the function will continue.

Works in sanitary preparations and the kitchen area begin simultaneously together with house painting. Paintings Studio is advisable to fulfill alleged “dirty” works within the first location and simultaneously. In accordance with the program of the sanitary technician location welding, wall chasing in addition to pipe run are usually conducted. Steam radiator admissions are ready, taps and brackets are mounted, yet radiators are not set up.

Then works inside sanitary arrangements are conducted based on the strategy. The bath is usually mounted, then walls are smoothed out there and the floor tile is laid on walls. The following stage is assembling ceiling and putting tiles on the floor. And in last other hygienic devices, mixers and accessories are mounted.

After wiring, unit installation of rosette dishes and terminal boxes the voltage is checked in every level. Ends of cabling are insulated and laid out in to rosette plates. Sockets and breakers are not installed during this stage in order to save their own surface appearance. The finish puttying regarding walls is conducted simultaneously. The technically exact control over drying out of the layer of the plast typer (filling) is transported out by drymeter. It is a new special instrument that will measures moisture regarding the material.

These stage is the particular means of fill. Fill may be made with different materials – from usual brickwork cement-sand mixture to be able to self-aligning floors. The particular advantage of the particular simple mixture is its cheapness, the disadvantage is that will such mixture is much harder in-line at the stage and the final dry time of such fill is usually 40 days, just then the subsequent stage of the particular work with floor may be conducted, i. e. the time will be too long. Self-leveling self-aligning floors are much more expensive, yet more technological. Aligning occurs almost “automatically” i. e. fluid solution of mixture is poured out there, then it runs and you get the horizontal area. The final dry time is 15 days i. e. you could have significant time economy. The system “warm floor” is mounted into the fill. When the so-called “wet processes” are inapplicable the technology of the dry aiming (the fill technology) is used bases for floors along with adjustable floor battens are mounted.

Right after fill door containers and door are installed. Installation of doors must take in to the account width of future floor covering. After installation the door can be used off its knobs and removed till the end associated with repair or jam-packed into polyethylene motion picture to protect from damages. Simultaneously ceiling could be painted plus the tile can be laid for the reason that premises where it absolutely was planned. The ceramic tile must be set on the absolutely dried out overlay.

Finishing associated with the floor mounting depends on typically the planned covering. In most cases (if finish covering is just not the tile) fill up is covered by bitumen mastic in addition to plywood sheets are laid. They are usually fixed to the ground by self-tapping screws. One plywood linen is fixed by 30-50 self-tapping screws to provide typically the close fixing regarding plywood and long lasting service in the flooring without squeak and bulging. The hdf gives the added heat- and traditional insulation. After increasing of the particle board is completed, wallpaper regarding painting can end up being pasted on wall space.

In premises exactly where finish covering regarding the floor is usually laminated flooring or perhaps parquet hoard, the ordinary wallpapers are pasted (not for painting) in the 1st place. Then typically the flooring is installed.

If finish covering in the floor is the block parquet, the parquet is laid to begin with, and then it is scraped and covered simply by one layer regarding lacquer. After this particular the ordinary wall-papers are pasted plus the parquet is have the rest levels of lacquer (depending within the quality regarding the parquet and lacquer). The described consequence is connected only with such scrambling process when the great sum of dust will be created. Despite typically the fact that good floor grinders usually are equipped with the vacuum cleaner, typically the sufficient amount regarding dust is precipitated on surrounding subjects including walls. Dirt is very acerbic and is terribly washed off. That is why so as not to destruction wallpapers, they are pasted after scrambling and in purchase the parquet do not absorb the excessive moisture it is covered by the main one layer of lacquer before wallpaper pasting.

After this the main works may be considered to be able to be finished. It is left simply to install the plinths, decorative elements, breakers and sockets, drape holders, to suspend doors, plant-bands and others.

In conclusion this is necessary to be able to note that the sequence of performs was listed in general and could change based on the certain situation – typically the number of rooms in premise, your own resources, peculiarities associated with the construction associated with the multilevel property. It is centered on good sense and every person capable of analysis can independently create such the sequence.